• Case Studies
  • ACI implemented an Assembly shop & Production..

ACI implemented an Assembly shop & Production Routing Optimization Solution to provide optimal production planning through capacity optimization for a medical equipment manufacturer

A Texas based leading medical equipment manufacturer

Client Challenges/ Goals

Goals

  • Meet the production demands with limited perishable and non-perishable resources
  • Minimize the cycle time by eliminating the bottlenecks
  • Reduce the idle time

Challenges

  • Diverse products, equipment, and resources
  • Holdups in the production process
  • The immensity of the production data

Our Solution/ Approach

Solution

  • A recommender system was implemented, wherein it provided optimal production schedule considering the finite capacity and available resources.

Approach


    • A solver of the production schedule subjected to a customized set of constraints using the combinatorial optimization techniques

Case Study